Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2360

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美亚洲第一页 | 4虎2022年最新lpr | 一个人的视频在线观看完整版www | 欧美在线a| 性国产精品 | 亚洲 日本 欧美 日韩精品 | 在线观看高清视频 | 有没有免费的视频在线观看 | 一区二区视频在线播放 | 最近最新中文字幕在线第一页 | 久草视频福利在线观看 | 四虎影视国产在线观看精品 | 大柠檬导航香蕉导航巨人导航 | 午夜视频网 | 在线观看国产黄色 | 五月婷色 | 日日操狠狠操 | 一级做a爰片性色毛片小说 一级做a爰片性色毛片思念网 | 日韩视频一区二区在线观看 | 天天射影院 | 亚洲视频成人 | 日日日视频 | 亚洲一区www | 在线观看中文 | 伊人天天 | 成年人免费看视频 | 日韩 | 麻豆视频大全 | 久久一本一区二区三区 | 影音先锋精品国产资源 | 日本 免费 高清 | 亚洲视频免费看 | 大学生一级毛片高清版 | 日韩欧美在线视频 | 91精品国产自产在线观看永久 | 99在线观看免费 | 在线精品免费观看综合 | 白丝丝袜美女被男人桶30分钟 | 日韩中文在线观看 | www.怡红院| 欧美香蕉在线 |