Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2848

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 午夜精品久久久久久久四虎 | 主人在调教室性调教女仆照片 | 91国产区| 欧美囗交| 亚洲五月婷 | 日韩中文字幕高清在线专区 | 99尹人香蕉国产免费天天在线 | 日本人伦一区二区三区 | 日本精品一在线观看视频 | 乱人伦中文字幕视频在线 | 最新中文字幕免费视频 | 伊人精品视频 | 日本午夜在线视频 | 五月婷婷丁香综合 | 桃花岛在线播放免费观看 | 欧美一级一一特黄 | 欧美一级片免费 | 日本在线国产 | 日韩精品中文字幕一区三区 | 美女露隐私免费网站 | 日本二区视频 | 日本a级片免费看 | 四虎国内精品一区二区 | 日韩黄色一级 | 一级特黄录像视频免费 | 日本护士xxxxx高清免费 | 色综合色狠狠天天久久婷婷基地 | 1024国产你懂的日韩 | 91porn地址| 青青草原国产在线观看 | 美女与物动xxx | 看毛片免费 | 亚洲精品 欧美 | 欧美天堂在线观看 | 91视频不卡| 欧美亚洲性色影视在线 | 9热这里只有真品 | 久久精品免视着国产成人 | 亚洲天堂视频一区 | 99riav9 精品香蕉免费大视频 | 一本大道香蕉大在线最新 |