Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2384

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 艳妇涨乳哺乳小说| 2021免费全国凤凰楼信息| 日本xxxxxxxxx18| 91大神在线视频观看| 最新日韩| 欧美在线一区二区三区欧美| 女人18毛片视频一级毛片容| 久久精品影院一区二区三区| www.久| pregnant孕妇xxx| 欧美日韩国产高清视频| 91久久99久91天天拍拍| 浪小辉老师激情酒店| 99免费在线观看视频| 口工动漫在线观看| 日本高清在线免费观看| 初女破苞国语在线观看免费| 日本高清h色视频在线观看| 欧美日韩中文一区| 热最近热久点| 欧美黑人巨大肥婆性视频| 中文字幕高清有码在线中字| 三体动漫在线观看全集免费观看| 在线欧美视频免费观看国产| 艳姐李铁柱王淑兰的小说| 91国产自拍视频| 九七婷婷狠狠成人免费视频| 青草青视频在线观看| 欧美日韩一区二区三区视频播| 免费看三极片| 91女神娇喘| 古装一级淫片a免费播放口| 3d美女被吸乳脱动漫漫画| 久久精品视频99精品视频150| 久久精品国产99久久3d动漫| 久热精品免费视频| 高h乱np交换杂交bl| 日韩精品一区二区三区中文3d| 免费观看视频高清www| 三级女明星冰恋开膛肠子| 在线播放麻豆|