www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2340

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 在线看欧美成人中文字幕视频| 欧美日韩 国产区 在线观看| 一个人在线高清全视频动漫| 人善交xuanwen| 最新版天堂资源8| 这里只有精品在线| yy4080午夜理论一级毛片| yellow视频2019在线观看| 日韩精品毛片| 成人小片magnet| 高清视频在线免费| 毛片在线观看| 久久国产香蕉| 草莓向日葵秋葵番茄丝瓜大全未满18| 免费公开在线视频| 99热播| 男人在线网站| 久久成人免费观看全部免费| 51vv福利视频在线精品| 免费看叼嘿视频| 中国女人性姣配| 农夫69我与老太在半山坡上| 丁香六月婷婷综合激情动漫| 久久久www免费看片| 日本高清乱码中文字幕| 一个人在线看的www视频| chinese中国娇小videos| 欧美精品h在线播放| 日本成人在线看| 超h 高h 污肉1v1快穿| 久久免费精品一区二区| a亚洲欧美中文日韩在线v日本| 老牛影院在线播放一区二区| 肉小说集全文免费阅读| 嫩小性性性xxxxbbbb| 爱操影院| 99精品视频不卡在线观看免费| 欧美日韩国产深夜福利视频| 日本最新男男gayjapanhd| 欧美岛国大片| 久久久9999久久精品小说|