Analysis of key construction points of steel column and frame beam of high-rise steel structure

Time:[2021-8-25]  Hits:2521

Analysis of key construction points of steel column and frame beam of high-rise steel structure

1、 Analysis on key points of steel column construction of high-rise steel structure

Steel column is a vertical component that determines the floor height and the total height of the building, and its fabrication and processing needs to meet the corresponding specifications and standards. At the same time, the shrinkage deformation of the weld and the compression deformation caused by the vertical load need to be considered in the process of turning and blanking. Therefore, the turning and blanking length of the steel column is not equal to the design length, even if it is only a few millimeters, it can not be ignored. Moreover, when the sections of the upper and lower steel columns are completely equal, they are not allowed to be interchanged. It is required that each steel column shall be numbered differently and installed in place correctly. The welding of stiffener plate in rectangular or square steel column shall adopt nozzle electroslag welding according to the requirements of current specifications, and other forms such as opening on box plate and slot plug welding are not allowed.

2、 Analysis on key construction points of high-rise steel structure frame beam

In order to ensure that the joint area at the connection between the frame beam and the steel column has good ductility, connection reliability and floor height accuracy, during factory manufacturing, a cantilever beam (short corbel) is set at the position where the frame beam is located. The connection between the upper and lower flanges of the cantilever beam and the steel column adopts cut penetration weld, and the web adopts fillet weld. The frame beam is connected with the cantilever beam (short corbel) of the steel column, the upper and lower flanges are connected by the full penetration weld of the lining plate (also the arc striking plate), and the web is connected by high-strength bolts. Since the allowable deviation of reinforced concrete construction is far greater than the accuracy requirements of steel structure, when the frame beam is connected with reinforced concrete shear wall or reinforced concrete cylinder wall, the connecting plate of web can be opened with elliptical holes, which shall meet the requirements of hole edge distance. The blanking length of frame beam is also not equal to the design length, and the welding shrinkage deformation shall be considered. The welding shrinkage deformation can be calculated by empirical formula, and then checked according to the actual processing, so as to determine the exact length of the turning and blanking. High strength bolt connection or welding connection can be adopted for the connection of the upper and lower flanges of the frame beam. At present, most of them adopt full penetration welding connection with lining plate. During construction, the lower flange shall be welded first, and then the upper flange shall be welded. One end shall be spot welded for positioning, and then the other end shall be welded. The web is connected with high-strength bolts. It is necessary to fully understand whether friction type or pressure bearing type high-strength bolts are used in the design. The friction coefficient of friction type high-strength bolt should be selected reasonably. When using high-strength bolt group connection, the accuracy of hole position is very important. At present, template drilling and multi axis NC drilling are generally used for hole making. The former has low precision and the latter has high precision, so the latter should be given priority. When the formwork is used to make holes, the accuracy of the formwork shall be ensured to ensure the accuracy requirements of the assembly holes of high-strength bolts and site installation holes. In case of local deviation of hole position, reaming with reamer is only allowed. It is strictly prohibited to use gas cutting for hole expansion. If gas cutting is used for hole expansion, it shall be handled as a major quality accident.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 手机看片久久国产免费不卡 | 白丝美女被狂躁免费漫画 | 久久99国产精品成人欧美 | 亚洲 欧美 精品 | 日本护士野外奶水hd | 亚洲欧美在线视频 | 欧美视频一 | 性做久久久久久 | you在线观看免费完整版 | 成人欧美一区二区三区在线 | 青草视频在线观看完整版 | 日本大蕉香蕉大视频在线观看 | 日本高清免费中文在线看 | 亚洲精品第一页中文字幕 | 日本一本二本视频 | 毛片免费在线观看 | 青草青草久热精品视频99 | 日韩中文有码高清 | 成人免费久久精品国产片久久影院 | 99精品视频不卡在线观看免费 | 中文字幕在线视频第一页 | 日韩专区一区 | 亚洲免费在线看 | 一卡二卡≡卡四卡亚洲高清 | 速度与激情9免费完整版高清 | 99久久综合狠狠综合久久男同 | 久九九久福利精品视频视频 | 速度与激情9下载 | 欧美特黄a级高清免费大片 欧美丝袜激情办公室在线观看 | 竹内纱里奈一88av在线 | 老司机午夜精品网站在线观看 | 免费观看成人 | 大学生破女白浆第一次 | 日韩视频一区二区在线观看 | 亚洲精品免费在线视频 | 日日摸日日碰夜夜爽97纠 | 亚洲wwww| 欧美日韩在线播放一区二区三区 | 亚洲日韩中文字幕在线播放 | 亚洲欧洲精品视频在线观看 | 小说区 亚洲 自拍另类 |