Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:2670

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 成人国产永久福利看片| 99亚洲精品视频| 免费香蕉视频国产在线看| 爸爸操儿子| 清风阁黄色网| 尤物在线免费视频| 楚乔传第二部(全60集)免费播放| 麻豆va一区二区三区久久浪| 免费看黄动漫车车好快的车车名| 摩托罗拉a780| 亚洲在线成色综合网站| 99久久久国产精品免费播放器| 91p0rny九色| 久久影院毛片一区二区| 最新国产精品视频免费看| 男同志chinesegay国产| 91精品国产91久久久久青草| www尤物| 古代三级在线大全视频| 18到20岁女人一级毛片| 麻豆网在线观看免费完整版| 情趣白丝女仆下部被揉小说合集| 免费人成网站免费看视频| 二区久久国产乱子伦免费精品| 久久96国产精品久久久| 久久综合久久网| 一本大道香蕉大在线最新| 大学生第一次破女在线观看| 99久热任我爽精品视频| 福利视频网页| 99激情网| 亚洲愉拍一区二区精品| 综合色区| 欧美成人xxxx| 欧美男男军人gayvideos| 2021国产精品午夜久久| 日本奴隷bdsmtv变态| 成人高清在线视频| 久久911| 拨牐拨牐永久华人海外网站| 99久久精品国产一区二区三区|