Home > News > Project cost control for wholesale metal building systems
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:2884

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 一区二区三区精品国产欧美| 18岁身份证号码和真实姓名2023| 91精| 日本女人被黑人操| asaakira大战85分钟| 中文有码在线观看| 99精品欧美一区二区三区| 麻豆调教| 欧美男男gay1069大长吊| 蘑菇视频在线观看| 欧美一级在线观看播放| 综合7799亚洲伊人爱爱网| 欧美成人eee在线| 欧美一卡一卡二新区无人区| 免费一级大片儿| 日本中文不卡| 欧美日韩精品| yw.193.c㎝国产在线观看| 久久99国产亚洲高清观看韩国| 欧美精品在线免费| 日本视频www色变态| 本色在线免费观看| 欧美黄色免费在线观看| 福利二区| 97影院理论午夜论不卡| 欧美人善zozσ性伦交| 欧美视频一区二区三区| 一区二区三区国产精品| 扒开屁股让客人打着玩| 男男gaytwinkchinese| 18到20女人一级毛片| 老头乐gayoldman2| 高大肥臀老妇满足我小说| 免费三极片| 男女黄漫全身无遮挡网站动漫| 愉拍精品视频在线观看| 办公室3p湿到爆黄文| 日本久久高清视频| 欧美日韩在线播一区二区三区| 美女福利在线观看| 宠妃流奶h|