www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Cost control in the design stage of steel structure building
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Cost control in the design stage of steel structure building

Time:[2020-10-13]  Hits:3467

Engineering cost control in material selection

 

As my country's steel production continues to increase year by year, steel varieties tend to diversify. Various new building materials, such as lightweight thermal insulation wall panels, color-coated profiled steel plates, floor decks, etc., have been continuously developed and promoted. Building steel structures have more room for material selection in the design stage. The choice of materials is different, the direct cost of the project is different, and the total cost is different. Reasonable selection of building materials in the design stage and control of the unit price of materials or engineering quantities are effective ways to control the project cost.

 

 

Many, high-rise steel structure building (roof) floor deck: in design, according to the role in the building (roof) structure system, the floor deck can take two forms, namely ① the floor deck is only permanent The formwork generally adopts ordinary galvanized profiled steel plate, which has lower requirements for minimum galvanizing amount and fire resistance time, and is relatively cheap; ②As a formwork during construction, it replaces the tensioned steel bars in the use stage, that is, composite floor slabs. Since the floor deck is considered as a tension bar in the design, its service life must be consistent with the service life of the main steel structure, so its minimum galvanizing amount and fire resistance time are relatively high, and the unilateral price is relatively high.

 

 

Steel specifications and materials: Due to the increase in steel varieties, there are more types of components available for structural design. For example, frame columns can adopt hot-rolled H-beams, welded H-beams, spiral welded round steel pipes, welded square steel pipes, and combined cross-sections, and steel beams can take forms such as equal cross-sections and variable cross-sections. The material can be Q235 plain carbon steel or Q345 low alloy steel. High-strength materials should be used as much as possible in the design. For example, the use of Q345 steel can save 15%-25% of steel than the use of Q235 steel, and the saving ratio for tensile or bending components is larger. When designing, choose economical cross-section steel, such as hot-rolled H-section steel, T-section steel, etc. In some cases, the use of hot-rolled H-section steel columns and beams may use slightly more steel than the use of welded H-section steel. However, considering the processing cost and construction schedule, the cost may be more advantageous.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 色综合天天综合网国产成人 | 草瘤视频| 青青操操 | 青青青国产在线观看 | 日韩经典在线 | 97在线影院 | 日韩av一中美av一中文字慕 | 久热香蕉视频 | 四虎精品永久在线网址 | 榴莲视频破解版vip无限观看 | 与青春有关的日子完整版免费观看 | 青草视频在线播放 | 日韩欧美中文字幕在线播放 | 亚洲欧洲综合 | 日本高清视频在线观看 | 百合扶她小说 | xxxxx动漫 | 色老司机| 91在线区啪国自产网页 | 欧美丝袜一区二区三区 | www.91香蕉 | 一二三四视频观看中文在线看 | 亚洲v天堂| 欧美金发大战黑人最粗videos | 成人无码嫩草影院 | 一级毛片在线免费播放 | 亚洲国产影院 | 久久精品国产清高在天天线 | 动漫美女下体阴部漫画 | 成年在线视频免费视频观看 | 男人迈开腿尝尝你的草莓 | 免费人成视网站在线不卡 | 成人国内精品久久久久影 | 日本韩国欧美三级 | 高h道具play肉女攻 | 日韩无人区码卡二卡3卡4卡介绍 | 99热免费观看 | 欧美亚洲国产一区 | 青草久草| 5g影院天天5g天天爽网站 | 欧美精品网站 |