www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Cost control in the design stage of steel structure building
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Cost control in the design stage of steel structure building

Time:[2020-10-13]  Hits:2991

Engineering cost control in material selection

 

As my country's steel production continues to increase year by year, steel varieties tend to diversify. Various new building materials, such as lightweight thermal insulation wall panels, color-coated profiled steel plates, floor decks, etc., have been continuously developed and promoted. Building steel structures have more room for material selection in the design stage. The choice of materials is different, the direct cost of the project is different, and the total cost is different. Reasonable selection of building materials in the design stage and control of the unit price of materials or engineering quantities are effective ways to control the project cost.

 

 

Many, high-rise steel structure building (roof) floor deck: in design, according to the role in the building (roof) structure system, the floor deck can take two forms, namely ① the floor deck is only permanent The formwork generally adopts ordinary galvanized profiled steel plate, which has lower requirements for minimum galvanizing amount and fire resistance time, and is relatively cheap; ②As a formwork during construction, it replaces the tensioned steel bars in the use stage, that is, composite floor slabs. Since the floor deck is considered as a tension bar in the design, its service life must be consistent with the service life of the main steel structure, so its minimum galvanizing amount and fire resistance time are relatively high, and the unilateral price is relatively high.

 

 

Steel specifications and materials: Due to the increase in steel varieties, there are more types of components available for structural design. For example, frame columns can adopt hot-rolled H-beams, welded H-beams, spiral welded round steel pipes, welded square steel pipes, and combined cross-sections, and steel beams can take forms such as equal cross-sections and variable cross-sections. The material can be Q235 plain carbon steel or Q345 low alloy steel. High-strength materials should be used as much as possible in the design. For example, the use of Q345 steel can save 15%-25% of steel than the use of Q235 steel, and the saving ratio for tensile or bending components is larger. When designing, choose economical cross-section steel, such as hot-rolled H-section steel, T-section steel, etc. In some cases, the use of hot-rolled H-section steel columns and beams may use slightly more steel than the use of welded H-section steel. However, considering the processing cost and construction schedule, the cost may be more advantageous.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 一二三四视频观看中文在线看| 99玖玖| 九色福利| 免费看久久| caopen在线视频| 动漫美女露出强行男生揉| 奇米影视奇奇米色狠狠色777| 51vv福利视频在线精品| 调教室论坛| 2019久热精品视频在线看| 范冰冰xxx在线观看| 97久久曰曰久久久| 日本高清免费zzzzzzzz| 一区二区不卡在线观看| 男人的天堂免费视频| 日本高清在线观看| 全亚洲最大的777io影院| 农奴-高清完整版在线观看| 美女和帅哥搞基| 日韩女人毛片在线播放| 亚洲依依成人综合网址首页| zo0o与人xxx欧美另类| 91小视频版在线观看www| 欧美一级在线观看| blacked欧美金发大战黑人| 老太婆毛茸茸一级毛片| 久久久国产精品va麻豆| 免费人成网555www| 变态tickle丨vk折磨男| free性chinese乱子| 日韩欧美一区二区三区在线播放| 色成人免费88v| 日本在线视频精品| adc成人影院一级毛片| 久久国产精品亚洲一区二区| 一二三四免费高清观看在线观看| 日韩欧美国产在线看二区| 99九九99九九九视频精品| 伊人情成综合网2019| 任你操视频| 欧美va放荡人妇大片|