Construction measures of Foshan steel structure during rainy season

Time:[2017-9-27]  Hits:4444

First, Foshan steel structure project rainproof measures
Arrange special people to know the weather forecast in time and master the weather data in advance. Arrange the inspection management of special site in rain, do not comply with the rainproof measures or measures non-standard place, must subcontract deadline ordered rectification, especially for lightning protection measures must be carefully check all.
Two, Foshan steel formwork rainproof measures
When the formwork is stacked, the lower layer must be ground with the ground to prevent the rain from soaking and damaging. At the template stacking site, effective ground drainage measures must be taken to prevent rainwater from depositing.
Three. Rainproof measures for reinforcing bars
L for the site to place a longer time to prevent rain reinforcement steel cover, prevent serious corrosion of reinforcement. The steel stacking site must have good drainage to prevent rainwater from depositing and soaking the corroded reinforcement.
2 Foshan steel structure rainproof measures
To ensure the normal construction period, ensure the quality of the project. The main process of the project and the climate sensitive process, should be based on the characteristics of the rainy season construction, the preparation of the corresponding measures.
High strength bolts shall not be installed on rainy days, and no rain water shall be allowed on friction surfaces and high-strength bolts. During rainy weather, can not meet the requirement of production and can not guarantee the safety of construction, should stop construction. At this point, attention should be paid to ensure the safety of the work surface, set up the necessary temporary reinforcement measures. Steel structure hoisting must hang net in the outside of the building facade, building stairs, building adjacent edges and can not cover the holes to set up protective railing. For the components to be lifted, the water on the surface of the component shall be cleaned first, especially the friction surface of the component, and the surface layer shall be dried
3 、 welding of Foshan steel structure
Before the construction, should be in the operating platform than at the height of 1m welding with flame retardant woven cloth is tightly wrapped around the pillar, and the platform plane caves with asbestos clothgai Yan, so that the wind and the welding slag splashing down. In principle, outdoor welding is not performed on rainy days. Welding machine, welding wire, the cylinders should be placed in a special shed. So as not to damp the welding material.
4. Installation of high strength bolts for steel structure in Foshan
The use of high-strength bolt, high strength bolt with visual inspection, there shall be no rust, damage thread phenomenon, such as repair after use. Keep the connection clean and dry.
5, Foshan steel structure scaffolding rainproof measures
Rain, rain must be checked one by one to the scaffold fastener, and must check the scaffolding foundation is firmly in the inspection process. In the inspection process, construction and inspection personnel must ensure their own safety, protective measures in place, pay attention to anti-skid, fall prevention, is strictly prohibited command.
6, Foshan steel structure rain proof measures
All kinds of electrical leakage protection device must be sensitive, all kinds of construction line check, insulation outsourcing must be in good condition without damage, prevent leakage of rainwater electric wounding; outdoor setting electric welding machine, grinding machine, threading machine and other equipment should be set up under the upper canopy, take the method of preventing the rain soaked pad. Power line is not erected, bare or plastic wire, distribution box must rain. Metal mechanical and electrical equipment must adopt zero reliable protection, leakage protection device for motor switch box should be reliable. Any mechanical operator must be certified and wear insulated rubber gloves and insulated gloves as required. In case of heavy rain to stop all electrical and mechanical operations, the electric field of steel processing field must turn off the power, after the rain should timely check the organization safety performance of machinery, electrical appliances, rain weather prohibited lifting equipment and components and manual handling of materials or equipment etc.. The cable wires and wires used in the field are strictly forbidden to be soaked in rainwater or laid on wet ground. Overhead installation or underground installation and safe and reliable protection measures should be installed. Before the construction of the rainy season, the power supply, electric box, tower crane grounding, insulation and other projects shall be measured and recorded. After the rain, all electrical equipment and electrical boxes should be checked once. The doors of each electric box must be closed and must not be opened.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 500福利国产精品导航在线 | 日韩精品一区二区三区 在线观看 | 一二三四手机在线观看视频播放 | 日本人做真爱2分钟 | 日本人的一区二区三区四区 | 五月婷婷综合激情网 | 日本男女网站 | 啪啪tv软件 | 美女张开大腿让男人捅 | 欧美成人免费观看 | 亚洲欧美在线一区二区 | 啪啪网站视频 | 色综合天天综久久久噜噜噜久久〔 | 逼逼狗 | 亚洲性在线 | 白丝袜护士下面好滑好湿好大 | 免费三极片 | 最新国产在线 | 青青青青在线视频 | 泰剧不期而爱第三季免费全集观看 | 宅男噜噜噜66网站久久 | 中文字幕第23页 | 久久精品久久精品国产大片 | 日本美女视频韩国视频网站免费 | 青青草原网站在线观看 | 片在线观看| 自拍视频在线看 | 男人天堂免费视频 | 亚洲一区二区三区在线 | 99玖玖 | 最近韩国高清在线 | 欧美高清一区二区三区欧美 | 欧美国产片 | 青娱乐极品视频在线观看 | 欧美性aa| 亚洲蜜臀 | 在线调教| 久青草视频97国内免费影视 | 久久精品这里热有精品2015 | 亚洲视频在线免费 | 在线视频久 |