Three kinds of steel space truss construction method Guangzhou

Time:[2016-7-13]  Hits:4141

Guangzhou Steel grid construction, there are three methods, namely, high-altitude assembly method, the overall installation method, sliding method altitude. Here Guangzhou Steel Xiaobian you explain.

First, the high-altitude assembly method. Steel truss assembly is the use of high-altitude installation, the location where the design erection bracket assembly, and then use a crane to grid member sub-element air hanging to the design position, but the amount of the bracket assembly method is very large, high-altitude work more. This method is more suitable for high-strength steel truss bolted or bolt ball node.


Second, the overall installation method. It will be assembled into a whole grid on the ground, then lifting equipment to upgrade its entire design of the place is fixed. This construction method altitude less work, less assembly bracket, but also to ensure the quality of welding, which is focused on technical and lifting equipment. Overall installation method spherical joints steel truss apply. For different lifting equipment, installation as a whole is divided into multi-machine method Hoisting method, pull the lever lift-off method, electric screw lifting method.

Third, the high-altitude sliding method. In recent years, high-altitude construction parallel slip more and more, this approach is often more suitable for Guangzhou Steel theaters, auditoriums and other projects. Mostly on the grid auditorium bleachers set up assembly platform Tower, a building element assembly is completed, and then assemble the second unit, and so continue to slip forward assembly, direct access to the entire grid assembly is completed and moved into the place position.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 在线国产毛片 | 伊人久久大香线蕉观看 | 日本三级韩国三级欧美三级 | 亚洲欧洲日本在线观看 | 日韩另类| 91精品欧美产品免费观看 | 亚洲国产成人久久99精品 | 催眠触手调教改造养成催眠 | 热99视频| 777国产精品永久免费观看 | 4484在线观看视频 | 看强人物免费漫画入口免费 | 欧美高清一区二区三区欧美 | 四虎精品成人免费观看 | 久久婷婷伊人 | 亚洲乱码一二三四五六区 | 青青草视频免费在线观看 | 两个美女的胸互摸互揉接吻 | 四虎影院最新网站 | 午夜三级成人三级 | 青青视频免费在线观看 | 亚洲影视一区二区 | 欧美一级高清片在线 | dy8888影院午夜看片 | 久久96国产精品久久久 | 在线观看深夜视频 | 日本高清视频在线播放 | 日韩在线视频在线观看 | 中国国产一国产一级毛片视频 | xxx 亚洲厕所撒尿 | 日韩一区二区三区免费视频 | 成人免费观看完整视频 | 亚洲日韩中文字幕在线播放 | 最新韩国伦理片大全手机在线播放 | 美女胸又黄又禁动态图 | 一个人看的视频在线观看高清 | 日韩每日更新 | 麻豆tv破解网址 | 四虎成人影院网址 | 天天噜噜揉揉狠狠夜夜 | 美女张开腿让男人桶爽免费看 |