www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Foshan General Steel measuring program
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Foshan General Steel measuring program

Time:[2016-7-6]  Hits:3984

As the fundamental Foshan steel construction, during construction only, must be applied with a series of measurements and each process, measurement solutions throughout the entire construction process of steel Foshan, Foshan steel construction preparations key First, through high-precision measurement and calibration accuracy of the installation of the steel member to the specified location to meet the accuracy requirements, therefore, after the preparation, the measurement is the most keywords point below Katsukuni steel to introduce the next General steel measuring program

 

First, the measurement and control of all construction work Surveying work required to be responsible for the construction and installation of steel structures, Foshan, with supervision engineers test measurements and all auxiliary work conditions

Second, before the project began, the elevation and coordinate reference point and measuring point provided by the chief engineer, but if you think the information provided by contractors when there are problems, engineers need to think reflect

Third, after receiving measurement reference point provided by contractors, precision measurement of the measurement reference point to go to school, and to review the accuracy of the information and data reference point, and to be reflected in writing Engineer

Fourth, the contractors provide a reference point for the word basis, according to national mapping standards and engineering precision requirements, the control center set engineering and engineers to review

V. baseline, anchor construction, accurate control points and point of construction, after a final measure to detect and measure the positioning point accuracy meets the construction requirements

Sixth, protect the measurement is completed reference point, the reference lines,

7. After the installation is complete Foshan steel, at the same time each day to determine whether the measurement Foshan deformed steel node data, corrected if necessary

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久99精品久久久久久国产人妖| 91制片厂果冻传媒大象传媒| 麻豆视频大全| 免费观看亚洲| 日本在线视频二区| 操逼123| 草久久久| k逼视频| 追她上乖黑暗森林的小说免费阅读| 182.t v香蕉人人网站| 日本爱爱网址| 动漫挠脚心3d黄丨vk漫画| 伊人久久精品午夜| 欧美三级欧美成人高清www| 欧美性性性| pornodoxxx中国妞| www.色日本| 狼人影院在线观看入口| 日日天天| 2022中文字幕在线观看| 野外性xxxxfrxxxx| 超级乱淫护士| tube美国xxxx69| 久久国产精品视频一区| 日韩精品一区二区三区国语自制| 郁渔的偏执狂老公小说免费阅读全文| asaakira大战黑人| 日本一本高清视频| 在线国产日韩| 女人靠逼视频| 日本女人下面毛茸茸| 欧美性欧美| se视频在线观看| 一个人免费观看www视频在线| 每日更新国产精品视频| 孕妇性猛交xxxxxhd| 一区二区不卡在线| 欧美国产日韩久久久| 日b毛片| 91精品国产高清91久久久久久| 99精品福利视频在线一区|