Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4923

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 久久久久久午夜精品 | 高清视频一区二区 | 青青综合在线 | 桃花视频在线观看免费迅雷 | 欧美一区二区三区视频 | 免费看亚洲 | 日韩伦理视频在线观看 | 操比片| 日本无人区码卡1 | 性色视频在线观看 | 一个人看的www免费高清在线播放 | 日韩一级片免费观看 | 日本高清在线一区 | 午夜久久久久久久 | 青娱乐九色 | 久久精品国产免费观看99 | 久久99精品久久久久久欧洲站 | 欧美一级特黄一片免费 | 一区福利视频 | 一级做性色a爰片久久毛片免费 | 久久精品视频免费观看 | 日本在线视频一区二区三区 | 欧美亚洲日本国产 | 青青操国产 | 久久福利青草狠狠午夜 | 日日躁夜夜躁狠狠天天 | 在线亚洲+欧美+日本专区 | 色a | 干极品美女 | 一个人看的免费影视www | 欧美成人国产一区二区 | 日本宅男午夜免费永久网站 | 开小箩莉嫩苞h嗯嗯好疼小说 | 青娱乐在线免费观看 | 亚洲aa在线 | 中国明星freesexhd图片 | 亚洲精品九色在线网站 | 日本乱码一区二区三区芒果 | 成人影院免费观看 | 四虎免费最新在线永久 | 亚洲福利秒拍一区二区 |