Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4482

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 野外一级毛片黑人| 麻豆成人在线观看| 亚洲资源在线视频| 欧美国产成人在线| pregnancy性孕妇| 日韩在线网站| 老师别揉我胸啊嗯上课呢| 久久99这里只有精品国产| h啪肉np文校园| 色播网址| 久久久久久午夜精品| 116美女午夜视频| 办公室激情第二季波多野结衣| 老师全彩无遮巨大乳尖奶动漫| 一二三四视频免费观看1| 4480午夜| 成人国内精品久久久久影院| 扒开粉嫩的小缝喷出水视频| 91免费国产| 91香蕉国产亚洲一区二区三区| 99精品视频不卡在线观看免费| 久久久国产这里有的是精品| 免费一级大片儿| 屁股眼夹得我好爽| 女警被绑被迫穿白丝女仆装| 免费一级毛片在线播放视频| 欧美另类综合| 色爱区综合网| 亚洲影视久久| 久久精品视频99精品视频150| avzaixian| 久久线看观看精品香蕉国产| 日韩精品一区二区三区中文3d| 91精品久久久久| 欧美 亚洲 日本| 综合六月| hs网站在线观看| 在线视频99| 日韩a一级欧美一级在线播放| 91pron在线观看| 欧美四虎精品二区免费|