Housing Construction - large steel structure construction technology of installation of slip

Time:[2016-3-19]  Hits:4049

Guangzhou Steel tells you: Housing Construction - large steel structure construction technology of installation of slip

Guangzhou Steel News 1. Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of construction plan
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 99亚洲精品| 中文版在线乱码在线看| 99视频精品全部在线播放| 美女隐私尿口视频网站| 日韩男人天堂| 日本中文不卡| 日韩欧美一区二区三区不卡| 日本手动强动漫人物免费| 久久99久久成人免费播放| 免费一区二区三区视频导航| 一区二区三区视频在线观看| 3311原七豆浆理论片| 在线视频精品播放| 一卡2卡三卡4卡3卡欧美| 久久国产精品二国产精品| 日本视频网站在线www色| 草草视频在线播放| 5566在线资源| 日本手机看片| 门房秦大爷全文在线阅读| 成年人免费在线视频观看| 99精品国产综合久久久久五月天| va天堂va亚洲va影视中文字幕| 色久综合大榴莲| 成年视频免费观看| 综合小说图片| 一区二区在线免费视频| 免费播放全黄录像带| 欧美xxxx69tube8护士| 纵情小说| 日韩激情中文字幕一区二区| gay视频h| 青青草华人在线视频| 久久精品亚洲综合| www.樱桃视频| 99久久精品费精品国产一区二| 北岛玲heyzo在线播放| 暖暖 高清 在线 视频| 男女男精品视频在线播放| 麻豆沈芯语| 美国一级毛片片aaa|