Housing Construction - large steel structure construction technology of installation of slip

Time:[2016-3-19]  Hits:4545

Guangzhou Steel tells you: Housing Construction - large steel structure construction technology of installation of slip

Guangzhou Steel News 1. Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of construction plan
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美亚洲另类久久综合 | 嫩草影院成人 | 四虎影视ww5234hucomww网站 | 伊人影院在线观看 | 欧美综合图片一区二区三区 | 又大又硬又爽又粗又快的视频免费 | wwwcom日本| 男人j桶进女人p免费播放 | 久久免费观看国产精品88av | 天啪天天天天拍天天碰 | 一级女性全黄久久生活片 | 一级黄色在线观看 | 亚洲天堂毛片 | 日本在线视频免费 | 日本一区二区三区久久 | 殴美激情 | 日本欧美黄色 | 操综合网 | 天堂伦理片 | 99久久99这里只有免费的精品 | 久久免费手机视频 | 草莓视频成年人 | 天天干夜夜噜 | 在线观看免费毛片 | 免费的视频网站入口 | 久久久五月 | 免费在线日本 | 一个人看的www在线动漫视频 | 日本艳鉧动漫 | 亚洲人成在线播放 | 日韩精品视频在线观看免费 | 伊人影片| 美女扒开大腿让男人桶尿口 | 3d动漫美女被乳羞羞动画 | 伊人55影院| 欧美videos粗暴老头 | 亚洲精品另类 | 大美女趴着打光屁股打红 | 亚洲最新在线观看 | 中文字幕高清有码在线中字 | 亚洲成a人片在线不卡 |