Guangzhou Steel teach you: steel welding engineering

(A) material quality requirements
(1) Canton steel welding works with a welding rod, wire, flux, electroslag weld mouth, studs, welding porcelain ring and shielding gas welding, etc. must be used with a factory quality certification, quality inspection reports and other documents.
(2) Guangzhou steel welding engineering, the general principles of the weld metal and base the selection of materials, such as strength of welding rod, wire, solder and other welding materials.
(3) welding, flux cored wire, electroslag weld mouth and studs with ceramic ring before use, must be baked in accordance with the provisions of the product description and related welding processes.
(Ii) quality control during construction
(1) When the welding operations ambient temperature is below 0 ℃ but not lower than -10 ℃, welded joints and welding surface should be in each direction is greater than or equal to 2 times the plate thickness range of not less than 100mm is heated to not lower than 20 ℃ After the minimum preheat temperature specified above and before welding, and the welding process should not be below this temperature.
Room (2) pre-heating and temperature control channels should adopt electric heating, flame heating and infrared heating plus heat method, and using special thermometer measurements. Preheat the welding area should be heated on both sides of the groove width of more than 1.5 times the thickness of the weldment welding, and not less than 100mm. Temperature measurement point, when non-members should be on the back of an enclosed space heating surface in the weldment from both sides of the weld groove at not less than 75mm, when the member is a closed space should be in the front side from the weld groove at not less than 100mm. When the process of selection of the preheating temperature is below the minimum specification requirements should be determined by the procedure qualification test.
(3) non-sparking arc welds on the base metal outside the area. In the groove arc welding a local area should not be leaving the crater. When the arc plate, lead plate and spacer plate when the steel should be used in the yield strength of not more than the nominal strength steel is welded steel, and weldability similar.
(4) The multilayer welds should be continuous welding, weld bead after each layer should be cleared up.
(5) Such as design documents or the contract documents required butt eliminate stress, the structure of the tensile stress fatigue check node butt or weld-intensive, member, should adopt the electric heater and partial annealing furnace annealing overall and other methods of stress relief treatment; if only stable structure size, vibration method can be used to eliminate stress.
(6) with a hammer method to eliminate intermediate solder layer stress, you should use the network first hand hammer or a small vibrating tool, should not be the root of the weld, the weld cap weld or bevel edge of the base material hammer.
(7) carbon steel welds should be cooled to ambient temperature, low-alloy steel should be after the completion of the welding seam 24h NDT testing.
(8) checks should be carried out after bending test weld stud welding, stud weld and heat affected zone bend 30 ° after there is no visible cracks.
(9) the repair welds should be continuous welded parts, should be taken if an interrupt after welding heat insulation measures to prevent cracks; repairing defects in the weld of the same parts of the number should not be more than twice the area of ​​welded joints should be increased after the repair powder or colored checks.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: chinese国产人妖视频 | 嫩模呻吟37分钟完整版 | 日韩日韩日韩日韩 | 亚洲第一区精品日韩在线播放 | 肉污小说| 日韩欧美网址 | 五月综合激情视频在线观看 | 高清一区二区三区视频 | 青青青视频免费一区二区 | 图片亚洲va欧美va国产综合 | 天天色踪合 | 性8成人有声小说在线播放 性 色 黄 一级 | 亚洲综合九九 | 又粗又硬又大又爽免费视频播放 | 日本搞鸡视频 | 中文字幕日韩专区 | 日本高清视频在线三级 | 色偷偷亚洲女性天堂 | 色综合色综合色综合色综合网 | 香蕉久草视频 | 色免费视频 | 中文字幕无码中文字幕有码 | 中文字幕激情视频 | 日韩视频中文字幕专区 | 日本视频在线观看不卡高清免费 | 最新在线观看免费视频网 | 99国产成人高清在线视频 | 四虎影永久在线观看精品 | 成人久草 | 日本中文在线观看 | 综合图区亚洲 | 欧美乱人伦中文在线观看不卡 | 中文字幕在线播放不卡 | 亚洲a视频在线 | 综合激情文学 | 性做久久久久久久 | 人碰人操 | 午夜在线影视 | 久久国产国内精品对话对白 | 91日韩精品天海翼在线观看 | 在线观看人成午夜影片 |