raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4914

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 一个人看的片免费高清大全 | 日韩中文字幕在线视频 | 2020久久| 美味的妻子在线观看 | 综合亚洲网 | chinesegay老汉老头 | 青青草华人在线 | 欧美曰韩一区二区三区 | 首页国产精品萌社区 | 亚洲国产精品久久久久666 | 免费国产成人高清在线观看不卡 | 亚洲欧美日韩国产色另类 | 情侣视频精品免费的国产 | 天天做天天爱天天影视综合 | 麻豆va一区二区三区久久浪 | 50岁的寡妇两个大乳 | 日韩在线播放视频 | 日韩另类 | 欧美一级一一特黄 | 亚洲第一页中文字幕 | 男人猛躁进女人免费观看 | 日韩高清专区 | 日本人与黑人做爰巨大和娇小 | 青草青草视频 | 手机看片日韩 | 日本三级成人中文字幕乱码 | 四虎影视免费观看免费观看 | 东北老夫妇啪啪嗷嗷叫 | 波多野结衣a v免费观看 | 日本欧美一级二级三级不卡 | 青草草视频在线观看 | 天天躁夜夜躁狠狠躁躁 | 欧美一级久久久久久久大片 | 四虎影视在线影院4hu | 在线观看亚洲 | 在线中文字幕一区 | 天天操天天操天天干 | 中国老头老太婆hdxxxx | 一级做性色a爰片久久毛片免费 | 亚洲国产天堂久久综合226 | 91久久麻豆 |