raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4437

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 69美女黑人做受xxxxxⅹ| 伊人网站在线观看| 日本漫画全彩口工漫画绅士| 男同hd| 亚洲最大福利网| vr专区精品中文字幕| 久久99国产视频| 久久婷婷国产综合色啪一| 日本在线视频一区二区| 波多野衣结在线精品二区| 一本岛乱码2021| 老师白妇少洁王局长| 中国老太太性生活| 在线看片y| fefe66免费毛片你懂的| 伦理片在线免费| 日日操夜夜操天天操| 欧美成人免费网在线观看| 久久精品国产只有精品6| 91久久香蕉| 欧美成人免费公开播放| 91久久精品国产免费一区| 风月海棠在线观看| 成人性色生活片免费看爆迷你| 大尺度人体videosex| 亚洲综合色婷婷| 乱人伦在线资源中文字幕| 猎奇重口h恶心变态小说| 老师影院| 16欧美freesex呦交hd| 日韩亚洲欧美一区噜噜噜| 老牛影视在线一区二观看| 久久91精品国产一区二区| 色老板在线视频一区二区| 91制片厂果冻传媒公司一卡| 日本色www| 日日操夜夜操天天操| 久久九九国产| 91制片厂果冻传媒公司麻豆| 一区二区视频| 免费在线欧美|