www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:4994

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: ts在线视频| 久久91精品国产一区二区| 久久国产国内精品对话对白| 99久久国产综合精品2020| 91在线精品| 毛片一级片| 2019天堂精品视频在线观看| 日本在线观看不卡| 濑亚美莉大战黑人在线观看| 久久久不卡国产精品一区二区| 日韩亚洲天堂| 久久久久香蕉视频| 高h无遮挡免费漫画3d| 伦理在线免费| freex性| 日本护士tube第一次| 美女毛片在线观看| 友田真希juy072羞在线观看| 恋梦空间第一季完整版免费观看| 日本特级淫片免费看| 插的好爽视频| bt7086 福利二区 最新合集| 51精品资源视频在线播放| 欧美一区二区三区视频| 久久久久999| 揄拍自拍日韩精品| 一区二区三区免费精品视频| 日日干天天插| 一级毛片国产真人永久在线| 老师的胸好大让我喝她的奶| 中文在线播放| 99热99操99射| 老司国产精品视频| 女教师pooping小便a| 一二三四免费观看在线6| 草莓樱桃丝瓜巨大的秋葵番茄| 99r精品视频| mypico动漫在线观看| 风间由美日本在线观看| 日韩欧美国产在线看二区| 一个人的视频在线观看完整版www|