www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:5543

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 成人精品一区二区www | 巨黄网站 | 欧美在线中文 | 天天干夜夜操 | 欧美亚洲日本 | 欧洲gay巨大 | 午夜视频在线网站 | 四虎影视免费永久在线观看黄 | 欧美国产精品一区二区免费 | 一二三四在线手机观看视频 | 青草福利 | 亚洲 国产 图片 | 日韩男人天堂 | 成人a毛片一级 | 日本一区二区三区四区无限 | 91麻豆精品国产91久久久久 | 亚洲黄色第一页 | 亚洲欧美天堂 | 天天插日日插 | 毛片一级片 | 欧美一级中文字幕 | 小草青青免费影视观看 | 91网站在线观看 | 手机亚洲第1页 | japanese色系护士java | 夜夜偷天天爽夜夜爱 | 久久成人精品免费播放 | 中文在线免费观看 | 亚洲欧美日韩图片 | 亚洲日本欧美日韩高观看 | 天堂最新在线资源 | 乱淫67194| 四月天中文字幕 | 日韩精品免费观看 | 亚洲国产精品久久 | 日本人xxxⅹ18hd19hd | 日韩在线视频一区 | 日本一区二区视频在线 | 在线视频 亚洲 | 呦视频在线一区二区三区 | 色婷婷六月丁香七月婷婷 |