www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Guangzhou Steel says:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Guangzhou Steel says:

Time:[2015-7-4]  Hits:4566

Guangzhou Steel says: "The construction quality inspection norms steel works' quality requirements and inspection provisions

(1) Guangzhou Steel Steel: The steel is one of the following conditions should be carried out sampling re-examination, re-examination of its results should be in line with national commodity specifications and design requirements: imported steel; steel mixed batch; thickness equal to or greater than 40mm, and slab design performance requirements.
Inspection reports of high strength large hexagon head bolts convergence deputy and vice torsional shear strength bolts factory should join with me respectively with the tightening torque coefficient and axial force (pre-tension) to: (2) convergence with the fastening member specification.
(3) Guangzhou Steel Engineering steel welding: carbon steel should be cooled to ambient temperature in the cold, low-alloy structural steel welding should end after 24h, conduct inspection of welds.
(4) Guangzhou Steel Fasteners convergence projects: Normal bolt when the bolt as a permanent link, when the design requirements or II statement of their mass, should be a minimum tensile load of the bolt physical reinspection. A convergence of high strength bolts, bolts should be separately produced and device unit for anti-slip friction coefficient test and retest the surface. 2 high-strength hexagon head bolts screwed convergence deputy final end 1h after the final screwing torque check should be carried out within 48h. 3 deputy final convergence of high strength bolts screwed threaded bolts exposed should be 2 to 3 buttons, which allow 10% of threaded bolts to reveal a button or 4 button.
(5) steel member assembly works: Cranes and crane truss girder should Deflection.
(6) The single steel apparatus engineering: all vertical single steel main structure of promised deviation should be consistent H / 1000, and not greater than 25.0; all the twists and turns of the promised plane deviation should be consistent L / 1500, and not greater than 25.0. Guangzhou Steel

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 免费一级毛片在线播放视频 | 97国产大学生情侣11在线视频 | 青青青爽视频在线观看 | 久久96国产精品久久久 | 91最新视频在线观看 | 久久精品国产99久久3d动漫 | 天天做天天躁天天躁 | 青青草免费在线观看 | 日本免费网站视频 | 日本高清在线观看视频你懂的 | 色天使色护士 在线视频观看 | 青草青草久热精品观看 | 色噜噜狠狠狠狠色综合久一 | 亚洲aa| 久综合网 | 人与牲动交xxxxbbbb高清 | 又粗又大又爽又紧免费视频 | 日韩欧美一区二区三区不卡 | 99久热任我爽精品视频 | 日本成人在线网站 | 日本大片免费观看视频 | 亚洲欧美日韩精品久久久 | 日美一级毛片 | 一区二区三区国产美女在线播放 | 欧美性xxxxx极品老少 | 在线麻豆视频 | 一a一级片| 欧美日韩综合精品一区二区三区 | 久久99精品视免费看 | 一二三四视频社区在线7二 一二三四视频免费观看高清版在线 | 四虎成人免费大片在线 | 中文字幕 制服诱惑 | 天使萌一区二区三区免费观看 | 色酷综合 | 欧洲美女高清一级毛片 | 久久亚洲伊人成综合人影院 | 人人爱人人插 | 日韩欧美一区二区久久黑人 | 浪货舒服吗好紧国产在线 | 天天射天天操天天 | 一个人看的www片高清在线 |