1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4478

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 青青爽国产手机在线观看免费| 老师的小兔子好软水好多动漫| gynoclinicd妇检free| juliaann被一群黑人| 2020国产麻豆剧传媒| 日韩在线亚洲| 纵情免费阅读| 尹人成人网| 97夜色爽爽影院在线观看| 久久99精品久久| 欧洲馒头大肥p| 99久久综合精品国产| 自愉自愉自产国产91| 日韩精品一区二区三区 在线观看| 92手机看片福利永久国产| 综合久| 欧美又粗又硬| 在线亚洲精品国产成人二区| 5xsq在线| 亚洲综合另类| 岳肥腚大乳| 九九免费视频| 高清 国产 日韩 欧美| 人人揉揉香蕉大免费不卡| 欧美一区二区三区网站| 久草资源| 久久亚洲这里只有精品18| haose16在线永久免费| 99精品视频99| 日韩在线观看高清| 欧美大胆一级视频| 恋梦空间第一季完整版免费观看| 久久99精品一区二区三区| 本色在线免费观看| 麻豆原创| 岛国毛片在线| 原神p站黄本子免费看网站| 中文字幕日韩一区二区不卡| www尤物| 日韩欧美视频一区| 久久国产乱子伦精品免费强|