www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > 1. Steel parts and steel components processing requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4898

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 99热这里只有精品国产99 | 色综合久久中文字幕综合网 | 亚洲天堂在线观看完整版 | 高清免费在线观看网址入口 | 多男玩一女的黄暴小说 | 速度与激情9免费完整版高清 | 亚洲人与牲动交xxxxbbbb | 久久国产精品一国产精品 | 调教美女校花 | 青草青青视频在线观看 | 情趣内衣女免脱啪啪 | 在线播放免费视频 | 亚洲免费视频网站 | 欧美午夜一区二区福利视频 | 午夜免费在线观看 | 99久久大香伊蕉在人线国产 | 考逼动漫 | 成年女人视频免费免费看 | 高清不卡一区二区三区 | 中文日韩字幕一区在线观看 | 医生护士一级毛片 | 在线看亚洲 | 动漫美女脱内衣18不能看 | 欧美日本另类xxx乱大交 | 99久久精品国产一区二区三区 | 天天做天天爱天天干 | 女教师在教室被灌满在线观看 | 日韩成人精品在线 | 青草青在线 | 公和熄洗澡三级在线观看 | 一级毛片黄 | 日本高清视频在线www色 | 在线免费观看网址 | 亚洲国产最新在线一区二区 | 日本a级片免费看 | 青娱乐国产在线观看 | 成人免费看黄网站yyy456 | japanesexxxxx日本54 | 欧美一级成人一区二区三区 | 伊人影视频 | 欧洲精品一区二区 |