Engineering Technology: General requirements for inspection of steel structure engineering foundation

Time:[2015-1-14]  Hits:4194

Engineering Technology: General requirements for inspection of steel structure engineering foundation

     Steel installation before positioning axis response, infrastructure and elevation axes, bolt size and location of the building, such as review, and should be the basis for the handover inspection and acceptance. Such as anchor bolts required to review each bolt axis, elevation, to go beyond regulatory requirements, must take appropriate remedial measures. Such as increasing the size of the column bottom in the column base plate according to the actual location of re-drilling screws.
     When the transfer of basic engineering batches, each less than a handover acceptance column base can form the basis of the degree of spatial steel mounting unit and shall meet the following requirements: basic strength of concrete to meet the design requirements; tamp backfill around the foundation is completed; foundation the elevation and the datum axis signs and point accurate and complete; the top surface of the foundation should be flat base surface of the secondary should be watered at cutting hair, anchor bolts should be intact.
The column axis bomb test in place of the column base surface.
     The column base level for leveling. Pouring concrete column base elevation is generally reserved for 50 to 60 mm (compared with steel column base design elevation), the installation is a steel plate or take advance using slurry leveling boards.
     When using the steel plate to make the support plate, the steel plate in the area before the bottom of the column should be secondary grouting withstand tensile load and bolt tightening calculated and determined according to the following compressive strength of concrete foundation, columns soles of the feet. Base plate and the contact surface and the bottom surface of the column should be smooth, tight.
     When the syrup should be used to sit for the board using non-shrink mortar, mortar pad before lifting pillar strength should be higher than a grade basis of concrete strength and mortar pad area should be sufficient to meet the requirements of hosting.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美极品alettaocean高清| vodafonewifl另类| 欧洲免费无线码一二区| 免费一看一级毛片| 潮湿的心动漫在线观看免费| 欧洲免费无线码一二区| 久久婷婷国产麻豆91天堂| 日本加勒比日本高清a区免费视频| 99ri在线| 欧美xxbbb1手交| 啪啪凸凸| 在线看片a| 久久国产欧美日韩高清专区| 久草院线| 久久福利青草精品资源站| 日韩免费精品视频| 一级片免费看| 日韩国产精品99久久久久久| 2019av在线播放| 欧美日韩国产综合视频一区二区三区| 中国老太性xxxxxhd| 99pao成人国产永久免费视频| 怡红院视频在线观看最新| 秋霞网亚洲成a人片| 久久国产免费观看| 中国一级毛片aaa片| 91尤物国产尤物福利在线| 爱情岛论坛首页aqdav| 毛片1| 69av视频在线观看| 一级片免费观看视频| 在线观看免费国产| 免费a级午夜绝情美女视频| 99精品视频看国产啪视频| 免费挠脚心tikitiki网站| 俄性teeηshd360| 日本系列第_1_页_俺去了| 强行挺进孕妇身体| 欧美同性videosbe| 久久久久久久成人午夜精品福利| 免费高清精品国偷自产在线|