Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:4852

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: xxxxx中国| 女人18毛片视频一级毛片容| 操比大片| 欧美精品在线免费观看| 伊人色啪啪天天久久网| 美女黄色影院| 日本福利在线| 一个人看的视频www在线观看免费| 成年男女免费视频网站播放| 久久成人精品免费播放| 在醉酒熟睡夫面前侵犯我在线播放| 中国免费观看的视频| 一个人看的www高清观看| 一边吃奶一边啪受不了好爽| 最新国产午夜精品视频不卡| 久久露脸国产精品| 日本视频www色变态| 99精品欧美一区二区三区| 夜夜撸在线| 男人j桶进女人p免费播放| tk挠脚心丝袜天堂网站免费控| np高h肉辣| 99视频这里有精品| 99热这里精品| 在英语课上强插英语课代表的网站| 口述爱爱小说| 在线观看国产情趣免费视频| 男主狠狠的要男配h| 成人video| 男女下面一进一出视频在线观看| 欧美成人 色 图| avhd101老司机入口| 日本一二区免费| 久久精品国产免费观看99| 日本免费一区二区三区最新vr| 另类专区欧美| 色久悠悠在线观看| 久久热这里有精品| 免费观看亚洲| 91热视频在线| 欧美卡一卡2卡三卡4卡在线|