www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Mixed steel installation drawings and design changes
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:5250

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日韩精品久久不卡中文字幕 | 老头乐gayoldman2 | 欧美成人午夜免费福利785 | 日本三级韩国三级香港三级网站 | 把女人弄得特爽黄a大片 | 欧美在线视频免费播放 | 久久国产精品视频一区 | 青青青免费高清视频在线 | 日韩亚洲制服丝袜中文字幕 | 99久久精品国产高清一区二区 | 亚洲国产艾杏在线观看 | 四只虎免费永久观看地址 | 色噜噜色噜噜天天拍一拍 | 91精品久久久久久久久网影视 | 日本免费乱人伦在线观看 | 久久久久久亚洲精品不卡 | 亚洲网站黄色 | 御书屋海棠书屋自由阅读的小说网 | 亚洲一区二区三区免费视频 | 最新版天堂资源中文官网 | 91一级毛片 | 俄罗斯厕所撒尿茸毛毛 | 久久亚洲精品中文字幕三区 | 四虎免费在线 | 午夜影院在线视频 | 一区二区三区国产精品 | 暖暖高清视频在线观看日本 | 亚洲高清在线视频 | 日韩黄色一级 | 在线免费看视频 | 白色蕾丝美妇旗袍成熟小说 | 轻点疼好痛太粗免费视频 | 青青青手机视频在线观看 | 日韩欧美一区二区久久黑人 | 在线观看人成午夜影片 | 中文天堂最新版www官网在线 | 色综合久久久 | 谷原希美jux865在线观看 | 日本一区二区三区免费观看 | a级黄色免费| 日韩精品一区二区三区不卡 |