Control of welding process elements in steel structure design engineering

Time:[2022-10-19]  Hits:1391

The steel structure planning project has extremely high strength, and better construction effect can be achieved when the plant floor is higher or the span is larger. However, many actual constructors in our country know little about the steel structure project, so they can't really grasp the welding key of the steel structure planning project, which has a certain impact on the final quality of the steel structure project. Therefore, in order to improve the construction quality of steel structure planning and construction, it is necessary to strictly control and control the welding part of the steel structure project to ensure the quality of the steel structure planning project and promote the continuous updating of the construction profession and construction skills.


1. Control of process factors


1.1 Control of pre welding preparation of steel structure planning project


Preparation before welding of steel structure planning mainly refers to groove preparation, welding equipment and cleaning of welding area.


(1) Preparation of groove: the processing of welding groove directly affects the quality of welding operation, so it should be operated strictly according to the steel structure planning process; Attention shall also be paid to the fact that the raw materials, specifications and types of the arc tab groove of the steel structure planning shall be the same as those of the base metal.


(2) Welding device: the device quality not only affects the dimensions of the steel structure planning components, but also has a certain impact on the weld formation. When welding the device, it is necessary to consider whether it is easy to weld after the device. If the device affects the normal welding of individual steel structure planning welds, it is necessary to weld this weld before installing other parts. All welding materials of the device shall match with the base metal, and the spot welding height shall not exceed 2/3 of the planned weld height of the steel structure.


(3) Cleaning of planned welding area of steel structure: oil stain, rust, dust, etc. on both sides of the joint shall be completely removed to prevent blowholes and cracks in the planned weld of steel structure.


1.2 Control of welding sequence


Selecting a reasonable welding sequence for steel structure planning can reduce the deformation degree of components and prevent the occurrence of cracks. Therefore, when selecting the welding sequence for steel structure planning, the welding seam should be in a relatively free shortening state as far as possible. The welding seam with a large shortening amount should be welded first, and then the welding seam with a small shortening amount, so as to ensure that the planned welding seam of steel structure has a large shortening freedom during welding and a small planned residual stress of steel structure occurs.


1.3 Control of welding process specification parameters


The welding process specification parameters of steel structure planning mainly include welding specification parameters, preheating temperature, post heat and hydrogen elimination treatment, post weld heat treatment, etc. The welding specification parameters are clearly specified in the process, and the steel structure planning workers should strictly follow the process. The selection of welding current and arc voltage for steel structure planning shall be emphasized. The current is too small and the arc is unstable, which is easy to cause slag inclusion, incomplete penetration and other defects; If the current is too large, undercut, air hole, welding and other defects are easy to occur, and they are added together by splashing. Long arc means high arc voltage, unstable arc burning, spatter addition, small penetration, and external air intrusion, which constitute the defects of air hole incomplete penetration.

 


The steel structure planning project is widely used in industry and public construction, and the welding process is the key process in the steel structure processing and manufacturing. Strengthening the quality control of the welding process can not only improve the quality of steel structure planning products, but also have a very important effect on the quality of the entire steel structure planning project. Based on this, this paper mainly discusses the key points of welding quality control in steel structure planning project.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 日韩中文在线观看| 白丝袜护士下面好滑好湿好大| 在线观看中文| 日本免费一区二区三区中文字幕| 乱码在线观看| 一区二区福利视频| 一级大学生日嘛批| aⅴ一区二区三区无卡无码| 久久99亚洲综合精品首页| 91精品久久久久| 欧美成人免费丝袜视频在线观看| 99久久久精品| 老师黑色丝袜大胸内裤内衣衣| 免费观看情趣v视频网站| 丁香花在线高清免费观看| 免费观看成人羞羞视频软件| 91w乳液78w78w乳液| 日本福利在线| 91播放在线| 成人免费久久精品国产片久久影院| 强行把校花处破了好痛小说| 成人影院免费www| 美女脱了内裤张开腿让女人添软件| 成年人视频在线看| 久久狠狠一本精品综合网| 日本人体337p| 欧美一级专区免费大片野外交| 欧美精品一区二区三区在线播放| 青青操操| jiucao视频在线观看| 美女露胸漫画| 菲律宾妞性xxxx| 在醉酒熟睡夫面前侵犯我在线播放| 在线观看永久免费| 俄罗斯一级特黄黄大片| 成人欧美一区二区三区在线| 美女脱了内裤打开大腿照片jk| 日韩中字在线| 大男人免费高清在线观看视频| 91最新视频在线观看| 亚洲永久|