Importance of structural design of multi-storey prefabricated workshop building

Time:[2022-4-29]  Hits:1973

In recent years, with the development of the diversity of the world economy, the industrial production of various countries and regions has also been continuously improved, and the complexity of the process layout is a revolutionary change for the industrial workshop buildings with single production function and simple building layout in the past; At the same time, the popularization of computers and the integration and simplification of structural calculation software have solved the complex and cumbersome structural calculation problems. As a result, multi-storey and even high-rise productive industrial buildings with large span, large space and complex building layout have emerged. Under the background of such rapid development, the rational selection of building structure layout and design parameters has played an important role in structural design.

1. Characteristics of multi-storey prefabricated workshop building

1.1 plane structure layout and column grid layout

In the plane layout of multi-storey prefabricated workshop building, usually in order to meet the process requirements: the structural layout is irregular, the pole network is irregular, and the beam layout is irregular, so there is the phenomenon of opening holes on the main stressed components according to the process requirements. At the same time, the internal space of the workshop building is generally large, and the column spacing is mostly 6 ~ 12m; The same part has the design of pulling column; The column spacing will increase to more than 18m. This makes the force transmission of the structure complex, the force is not clear, and the phenomenon of stress concentration is easy to occur in the design.

1.2 vertical structure layout and floor height

The storey height of multi-storey prefabricated workshop building is large, which can reach 4 ~ 8m, and there are often staggered floors and interlayer in the vertical layout, and large holes are opened in the floor, which makes the floor unable to provide sufficient in-plane stiffness, and the effective mass of the structure is unevenly distributed along the vertical direction. Under the action of earthquake, the structure may produce "short column effect", which makes the horizontal shear force of local column section become the control factor of section design.

1.3 various types of loads

The concentrated load of industrial workshop building mainly includes the self weight of equipment, and sometimes the vibration disturbance of equipment needs to be considered, and the dynamic calculation is carried out according to the requirements of the specification. Suspension load mainly includes pipeline load and crane load, and sometimes the pipeline also produces horizontal load and bending moment. The plate surface load is mainly based on the requirements of production technology. There are different values of live load on the ground of different production buildings, but this kind of live load is generally greater than that in civil buildings.


1.4 floor and foundation form

The cast-in-situ reinforced concrete floor is generally adopted for the floor of industrial workshop building. However, due to the equipment load requirements proposed by the process, the floor may have holes or local thickness changes. The foundation form of the powerhouse mostly adopts the independent foundation under the column and the strip foundation under the column. If the bearing capacity of the foundation is low, the lime soil compaction pile, sand pile and other methods can be used to deal with it, or the cast-in-place pile can be used to act directly on the hard soil layer.

1.5 light envelope

Generally, the enclosure structure of industrial workshop building is not used as a load-bearing system, and light materials are usually used. The roof structure mostly adopts steel truss purlin system with light insulation layer. This light enclosure material is beneficial to reduce the self weight of the structure and reduce the seismic response.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久中文字幕乱码免费| 日韩免费一区二区三区在线| 麻豆视传媒一区二区三区| chinese真实incest农村| 男人都懂的网址在线看片| 92午夜免费福利757永久| 91麻豆精品视频| 毛片在线播放网站| chinese国产hd中国麻豆| 日本精品一在线观看视频| 看看的在线视频国产| 么公的好大好硬好深好爽在线视频| 欧美高清视频www夜色资源| 日韩免费一区二区三区| 打开双腿狠狠蹂躏蜜桃臀| 久久香蕉国产精品一区二区三| 中国帅哥gary| 青青草网站在线观看| 一个人bd视频全免费| 1769视频在线| 嫩草影院在线视频| 98视频在线观看| www在线观看视频| 承德招聘信息最新招聘2023| 九九热最新网址| 久久久网站亚洲第一| 乱丶伦丶图丶区69| 在线免费观看资源高清| 综合亚洲精品一区二区三区| 一区二区在线播放福利视频| 一二三四视频社区在线中文1| 绿巨人黄色软件| 97青草最新免费精品视频| 一级成人毛片免费观看| 日韩亚洲成a人片在线观看| 美女扒开腿无遮挡私密部位| 成人影视在线播放| 91香蕉国产线在线观看免费| 一级性视频| 二区视频在线| 亚洲综合成人在线|