www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Main reinforcement construction methods of steel workshop building reinforcement
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Main reinforcement construction methods of steel workshop building reinforcement

Time:[2022-2-17]  Hits:2039

The reinforcement of reinforced concrete structures has been seen a lot, but do you know how to do the reinforcement of steel structures? Where are the common steel workshop building reinforcements generally used? Common steel workshop building reinforcement is mostly used in cooling towers, steel workshop buildings, steel structure interlayers and other places.

The main methods of strengthening the steel workshop building are:

Reduce the load, change the calculation graphics, increase the cross-section and connection strength of the original structural members, and prevent crack propagation. When there is mature experience, other reinforcement methods can also be used.

The identified steel structures that need to be reinforced are generally divided into local reinforcement and comprehensive reinforcement according to the scope of damage. Local reinforcement is the reinforcement of a bar or connecting node with insufficient bearing capacity.

Comprehensive reinforcement is the reinforcement of the overall structure, there are two types of reinforcement methods without changing the structure static calculation graphics and changing the structure static calculation graphics. Adding or strengthening the support system is also an effective way to strengthen the structural system. The reinforcement method of increasing the original member section is the most expensive and labor-intensive method (but it is often a feasible method); the method of changing the calculation diagram is the most effective and diverse, and its cost is also greatly reduced.

The construction methods of the reinforcement structure of the steel workshop building are as follows:

Load reinforcement, unload reinforcement, and removal of parts that should be reinforced or updated from the original structure for reinforcement. The construction method for the reinforcement of the steel workshop building should be determined by the designer and the construction unit through consultation according to the user's requirements and the actual stress state of the structure, under the premise of ensuring quality and safety.

(a)Reinforcement with load: the construction is the most convenient and economical. It is used when the stress of the component (or connection) is less than 80% of the design strength of the steel, or when the component is not significantly damaged (broken, deformed, warped, etc.). At this time, in order to make the new reinforced rod participate in the force, sometimes it is necessary to take temporary unloading measures for the reinforced rod. In addition, care should be taken not to affect the normal use of other components during reinforcement.

(b) Unloading reinforcement: It is suitable for when the structural damage is large or the stress state of the components and connections is very high, and its load needs to be temporarily relieved. For some structures that mainly bear movable loads (such as crane beams, etc.), their movable loads can be limited, which is equivalent to most of the unloading.

(c) Remove the parts that should be reinforced or updated from the original structure: when the structure is severely damaged or the bearing capacity of the original section is too small, it must be reinforced or updated on the ground. At this time, temporary support must be provided to completely unload the replaced component; at the same time, the safety of the entire structure must be guaranteed after the replaced structure is removed.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本韩国高清| 巨尻在线播放| 44kk44亚洲| 日本xxxwww在线观看免费| 日本在线视频一区二区三区| 欧洲成人r片在线观看| 91尤物视频在线观看| 久久久久久久久免费视频| 草莓视频污黄色| 成年男女的免费视频网站| 青青国产成人精品视频| 成人欧美精品久久久久影院| 麻豆一区二区三区四区| 99香蕉视频| 日韩一区二区三区在线视频| 18到20女人一级毛片| 麻豆专媒体公司网站| 在英语课上强插英语课代表的网站| 欧美日韩亚洲国产一区二区综合| 欧美同性精品xxxx| 日本伦理小说| 久久综合琪琪狠狠天天| 猛男gaygay免费网站| 在线播放毛片| 日本在线视频免费| 免费看叼嘿视频| 波多野结衣 一区| 大学生一级毛片高清版| 九九久久国产精品大片| 日本高清v| 27pao.cσm好吊色视频| 在线亚洲精品| 久热香蕉视频| 又黄又粗又爽免费观看| 成人免费福利片在线观看| 26uuu影院亚洲欧美综合| 日本xxxx96| 99精品这里只有精品高清视频| 日韩毛片免费视频一级特黄| 久久精品伊人网| 色www亚洲|